Operations

Demo available

Lunation Simulation

Know what every factory decision is worth before you make it.

Model your plants and network, test each option, and get one dollar answer for capacity, service and cost. In minutes, in your browser, without a specialist.

What changes for you

Simulation tells you how busy the plant is. Your board wants to know what it is worth.

Most simulation projects take months and depend on one or two experts. They end in a utilization chart, and someone rebuilds the economics in a spreadsheet that drifts from the model. By the time finance trusts the number, the decision has moved on.

  • Model the whole network.

    Plants, shifts, changeovers, inventory policy, transfers between plants and freight in one model.

  • See the dollars.

    Every scenario produces a P&L and a savings bridge from the model's own cost ledger. No side spreadsheet.

  • Ask in plain English.

    Type or speak a question. Ask Lunation answers from the model's results and shows where each figure came from.

  • Compare options fast.

    A locked baseline and versioned scenarios, each run in minutes, so leaders compare options in one meeting.

Your path

From your plant data to a dollar answer, in four steps.

StepWhat happensWhat you get
1. Load your plantsEquipment, shifts, routings and orders from your dataA model of how your plants actually run
2. Lock the baselineCheck it against how your plants ranOne version of the truth
3. Test the optionsAdd a line, move a product, close a plant, change a policyVersioned scenarios you can audit
4. Get the answerCapacity, service and a dollar bridge for each option, side by sideA decision the board can act on

What you get

One model for operations, finance and the board.

  • Operations: find the real constraint, and test a new shift, a new line or a plant move with the service impact shown before you commit capital.

  • Finance: a savings bridge by line item (labor, overhead, freight, conversion cost), generated by the model, not rebuilt by hand. Change an assumption and rerun in minutes.

  • A 3D view of the plant with playback, so leaders see the flow, the queues and the constraint.

  • Role views, so each leader sees the measures they own.

  • Nothing to install. It runs in the browser, and the same inputs give the same answer every time.

Proof

Rebuilt a real plant closure case. Same answer, no spreadsheet.

A multi-plant manufacturer with eight plants on three continents needed to know whether it could close one plant. The original study used a legacy desktop simulation model, a hand-built spreadsheet and about four hours per scenario run. Lunation rebuilt the network from the original inputs. Its cost ledger produced annual savings of $6.42M, within 0.6% of the original $6.46M analysis, computed inside the model.

MeasureOriginal studyLunation
EconomicsBuilt by hand outside the modelComputed in the model
Run time per scenarioAbout 4 hoursMinutes
Annual savings, plant closure$6.46M$6.42M

Built for PE portfolios

Test the footprint thesis before you commit capital.

ProgramWhat Lunation Simulation does
DiligenceTests the footprint thesis with capacity, service and cost together
First 100 daysA consolidation case the board can act on
Capacity and capexAdd a line, add a shift or move volume, with the dollar answer for each
Plant consolidationClose or shrink a plant and see whether customers are still served
Reshoring and tariffsWhere to make what across the footprint, with freight in the model

Your data, protected

Your plant data, under your control.

  • Runs in the browser on Lunation's AWS platform. Nothing to install.

  • Ask Lunation quotes figures the engine computed and shows the source for each. It never calculates its own.

  • Every scenario is built on a locked baseline with versioned changes, so each number traces to an approved assumption.

  • Your data is never used to train AI models.

  • SOC 2 audits are in process for all products.

How to start.

  • Factory Review

    Your plants and lines reviewed: where throughput stalls, where output is lost, and what each fix is worth in dollars.

    Book a Factory Review

What is at stake

Without it, you commit capital to a plant decision before you know what it is worth.

With it, you choose the option with the best dollar answer and the service your customers need.

Three steps to value you can prove.

  1. Start with a Factory Review.

    A fixed-scope review sizes what a change to your plants and network is worth in dollars.

  2. Get the plan.

    A board-ready roadmap with the value, owners and timing for each initiative.

  3. Capture it in the P&L.

    Run each initiative in Lunation and track the result against plan every month.

Bring us the decision you are facing.

See a full multi-plant network modeled, questioned and costed in one session.

Request a demo

Or call 817-796-8600.