Operations
Demo availableLunation Simulation
Know what every factory decision is worth before you make it.
Model your plants and network, test each option, and get one dollar answer for capacity, service and cost. In minutes, in your browser, without a specialist.
What changes for you
Simulation tells you how busy the plant is. Your board wants to know what it is worth.
Most simulation projects take months and depend on one or two experts. They end in a utilization chart, and someone rebuilds the economics in a spreadsheet that drifts from the model. By the time finance trusts the number, the decision has moved on.
Model the whole network.
Plants, shifts, changeovers, inventory policy, transfers between plants and freight in one model.
See the dollars.
Every scenario produces a P&L and a savings bridge from the model's own cost ledger. No side spreadsheet.
Ask in plain English.
Type or speak a question. Ask Lunation answers from the model's results and shows where each figure came from.
Compare options fast.
A locked baseline and versioned scenarios, each run in minutes, so leaders compare options in one meeting.
Your path
From your plant data to a dollar answer, in four steps.
| Step | What happens | What you get |
|---|---|---|
| 1. Load your plants | Equipment, shifts, routings and orders from your data | A model of how your plants actually run |
| 2. Lock the baseline | Check it against how your plants ran | One version of the truth |
| 3. Test the options | Add a line, move a product, close a plant, change a policy | Versioned scenarios you can audit |
| 4. Get the answer | Capacity, service and a dollar bridge for each option, side by side | A decision the board can act on |
What you get
One model for operations, finance and the board.
Operations: find the real constraint, and test a new shift, a new line or a plant move with the service impact shown before you commit capital.
Finance: a savings bridge by line item (labor, overhead, freight, conversion cost), generated by the model, not rebuilt by hand. Change an assumption and rerun in minutes.
A 3D view of the plant with playback, so leaders see the flow, the queues and the constraint.
Role views, so each leader sees the measures they own.
Nothing to install. It runs in the browser, and the same inputs give the same answer every time.
Proof
Rebuilt a real plant closure case. Same answer, no spreadsheet.
A multi-plant manufacturer with eight plants on three continents needed to know whether it could close one plant. The original study used a legacy desktop simulation model, a hand-built spreadsheet and about four hours per scenario run. Lunation rebuilt the network from the original inputs. Its cost ledger produced annual savings of $6.42M, within 0.6% of the original $6.46M analysis, computed inside the model.
| Measure | Original study | Lunation |
|---|---|---|
| Economics | Built by hand outside the model | Computed in the model |
| Run time per scenario | About 4 hours | Minutes |
| Annual savings, plant closure | $6.46M | $6.42M |
Built for PE portfolios
Test the footprint thesis before you commit capital.
| Program | What Lunation Simulation does |
|---|---|
| Diligence | Tests the footprint thesis with capacity, service and cost together |
| First 100 days | A consolidation case the board can act on |
| Capacity and capex | Add a line, add a shift or move volume, with the dollar answer for each |
| Plant consolidation | Close or shrink a plant and see whether customers are still served |
| Reshoring and tariffs | Where to make what across the footprint, with freight in the model |
Your data, protected
Your plant data, under your control.
Runs in the browser on Lunation's AWS platform. Nothing to install.
Ask Lunation quotes figures the engine computed and shows the source for each. It never calculates its own.
Every scenario is built on a locked baseline with versioned changes, so each number traces to an approved assumption.
Your data is never used to train AI models.
SOC 2 audits are in process for all products.
How to start.
Factory Review
Your plants and lines reviewed: where throughput stalls, where output is lost, and what each fix is worth in dollars.
Book a Factory Review
What is at stake
Without it, you commit capital to a plant decision before you know what it is worth.
With it, you choose the option with the best dollar answer and the service your customers need.
Three steps to value you can prove.
Start with a Factory Review.
A fixed-scope review sizes what a change to your plants and network is worth in dollars.
Get the plan.
A board-ready roadmap with the value, owners and timing for each initiative.
Capture it in the P&L.
Run each initiative in Lunation and track the result against plan every month.
Bring us the decision you are facing.
See a full multi-plant network modeled, questioned and costed in one session.
Or call 817-796-8600.